Sample typeCodeTestPrice (IQD)TimeDetails
Base Course Crushed Lime Stone 10-6-3 Crushed Surfaces
Earthworks & Soil Section
6,000 3-5 Days
Base Course Crushed Lime Stone 11-1-4 Compensation
Earthworks & Soil Section
4,000 3-5 Days
Base Course Crushed Lime Stone 13-1 SO3
Earthworks & Soil Section
14,500 3-5 Days
Base Course Crushed Lime Stone 13-21 Soundness
Earthworks & Soil Section
46,000 3-5 Days
Base Course Crushed Lime Stone 13-57 Gypsum
Earthworks & Soil Section
14,500 3-5 Days
Base Course Crushed Lime Stone 14-4 T.S.S
Earthworks & Soil Section
11,000 3-5 Days
Base Course Crushed Lime Stone 14-6 CaCO3
Earthworks & Soil Section
13,000 3-5 Days
Base Course Crushed Lime Stone 6-10 Plastic Limit
Earthworks & Soil Section
7,750 3-5 Days
Base Course Crushed Lime Stone 6-34 Distribution
Earthworks & Soil Section
8,250 3-5 Days
Base Course Crushed Lime Stone 6-35 Test definition
Earthworks & Soil Section
4,750 3-5 Days
Base Course Crushed Lime Stone 6-8 Liquid Limit
Earthworks & Soil Section
14,000 3-5 Days
Base Course Crushed Lime Stone 9-1 Gradation
Earthworks & Soil Section
17,500 3-5 Days
Base Course Crushed Lime Stone 9-10 Gradation Lime Stone
Earthworks & Soil Section
18,000 3-5 Days
Base Course Crushed Lime Stone 9-16 Dividing
Earthworks & Soil Section
11,000 3-5 Days
Base Course Crushed Lime Stone 9-17 Correction
Earthworks & Soil Section
50,000 3-5 Days
Base Course Crushed Lime Stone 9-18 Drying
Earthworks & Soil Section
30,000 3-5 Days
Base Course Crushed Lime Stone 9-2 Washing on 200
Earthworks & Soil Section
4,000 3-5 Days
Base Course Crushed Lime Stone 9-4 Abrasion
Earthworks & Soil Section
24,000 3-5 Days
Base Course Crushed Lime Stone 9-5 Flakiness
Earthworks & Soil Section
9,250 3-5 Days
Base Course Crushed Lime Stone 9-6 MDD
Earthworks & Soil Section
19,250 3-5 Days
Base Course Crushed Lime Stone 9-7 MDD 4\"
Earthworks & Soil Section
14,750 3-5 Days
Base Course Crushed Lime Stone 9-8 CBR
Earthworks & Soil Section
25,000 3-5 Days
Field Density 11-1-2 Sand Cone-Field Density
Earthworks & Soil Section
14,500 3-5 Days
Field Density 11-1-4 Compensation
Earthworks & Soil Section
4,000 3-5 Days
Field Density 11-6 Nuclear -Field Density
Earthworks & Soil Section
10,500 3-5 Days
Field Density 4-14-6 Equipment Transportation (More than 50) km
Earthworks & Soil Section
47,750 3-5 Days
Field Density 5-14-1 Reposition
Earthworks & Soil Section
2,250 3-5 Days
Field Density 5-14-2 Equipment transportation 1-10 km
Earthworks & Soil Section
11,750 3-5 Days
Field Density 5-14-3 Equipment transportation -Lab Vehicles
Earthworks & Soil Section
97,000 3-5 Days
Field Density 5-14-4 Equipment transportation 10-50km
Earthworks & Soil Section
44,250 3-5 Days
Field Density 6-1 Moisture Content
Earthworks & Soil Section
6,000 3-5 Days
Field Density 9-14 Nuclear Moisture Content
Earthworks & Soil Section
7,750 3-5 Days
Field Density 9-16 Dividing
Earthworks & Soil Section
11,000 3-5 Days
Field Density 9-17 Correction
Earthworks & Soil Section
50,000 3-5 Days
Field Density 9-6 MDD
Earthworks & Soil Section
19,250 3-5 Days
Field Density 9-7 MDD 4\"
Earthworks & Soil Section
14,750 3-5 Days
Field Density Nuclear 1-14-5 Reposition (No. of Point 1)
Earthworks & Soil Section
2,250 3-5 Days
Field Density Nuclear 2-14-5 Equipment Transportation (1-10)km
Earthworks & Soil Section
11,750 3-5 Days
Field Density Nuclear 4-14-5 Equipment Transportation (10-50)km
Earthworks & Soil Section
44,250 3-5 Days
Field Density Nuclear 4-14-6 Equipment Transportation (More than 50)km
Earthworks & Soil Section
47,750 3-5 Days
Field Density Nuclear 6-11 Nuclear-Field Density
Earthworks & Soil Section
10,500 3-5 Days
Field Density Nuclear 9-14 Moisture Content on Site
Earthworks & Soil Section
7,750 3-5 Days
Filling - پڕکردنەوە 11-1-4 Compensation
Earthworks & Soil Section
4,000 3-5 Days
Filling - پڕکردنەوە 13-57 Gypsum
Earthworks & Soil Section
14,500 3-5 Days
Filling - پڕکردنەوە 14-1 SO3
Earthworks & Soil Section
23,000 3-5 Days
Filling - پڕکردنەوە 14-2 Organic Material
Earthworks & Soil Section
7,500 3-5 Days
Filling - پڕکردنەوە 14-4 TSS
Earthworks & Soil Section
11,000 3-5 Days
Filling - پڕکردنەوە 14-6 CaCO3
Earthworks & Soil Section
13,000 3-5 Days
Filling - پڕکردنەوە 6-10 Plastic Limit
Earthworks & Soil Section
7,750 3-5 Days
Filling - پڕکردنەوە 6-34 Distribution
Earthworks & Soil Section
8,250 3-5 Days
Filling - پڕکردنەوە 6-35 Test Definition
Earthworks & Soil Section
4,750 3-5 Days
Filling - پڕکردنەوە 6-8 Liquid Limit (LL)
Earthworks & Soil Section
14,000 3-5 Days
Filling - پڕکردنەوە 9-1 Gradation
Earthworks & Soil Section
17,500 3-5 Days
Filling - پڕکردنەوە 9-16 Dividing the sample
Earthworks & Soil Section
11,000 3-5 Days
Filling - پڕکردنەوە 9-17 Correction
Earthworks & Soil Section
50,000 3-5 Days
Filling - پڕکردنەوە 9-18 Drying
Earthworks & Soil Section
30,000 3-5 Days
Filling - پڕکردنەوە 9-2 Washing on 200
Earthworks & Soil Section
4,000 3-5 Days
Filling - پڕکردنەوە 9-6 MDD
Earthworks & Soil Section
19,250 3-5 Days
Filling - پڕکردنەوە 9-7 MDD 4\"
Earthworks & Soil Section
14,750 3-5 Days
Filling - پڕکردنەوە 9-8 CBR
Earthworks & Soil Section
25,000 3-5 Days
Granular Behind Structure 9-1 Gradation
Earthworks & Soil Section
17,500 3-5 Days
Granular Behind Structure 9-16 Dividing the sample
Earthworks & Soil Section
11,000 3-5 Days
Granular Behind Structure 9-18 Drying
Earthworks & Soil Section
30,000 3-5 Days
Granular Behind Structure 9-2 Washing on 200
Earthworks & Soil Section
4,000 3-5 Days
Natural Ground - زەوی سروشتی 11-1-4 Compensation
Earthworks & Soil Section
4,000 3-5 Days
Natural Ground - زەوی سروشتی 13-57 Gypsum
Earthworks & Soil Section
14,500 3-5 Days
Natural Ground - زەوی سروشتی 14-1 SO3
Earthworks & Soil Section
23,000 3-5 Days
Natural Ground - زەوی سروشتی 14-2 Organic Material
Earthworks & Soil Section
7,500 3-5 Days
Natural Ground - زەوی سروشتی 14-4 TSS
Earthworks & Soil Section
11,000 3-5 Days
Natural Ground - زەوی سروشتی 14-6 CaCO3
Earthworks & Soil Section
13,000 3-5 Days
Natural Ground - زەوی سروشتی 5-11 Sampling
Earthworks & Soil Section
14,750 3-5 Days
Natural Ground - زەوی سروشتی 6-10 Plastic Limit
Earthworks & Soil Section
7,750 3-5 Days
Natural Ground - زەوی سروشتی 6-34 Distribution
Earthworks & Soil Section
8,250 3-5 Days
Natural Ground - زەوی سروشتی 6-35 Test Definition
Earthworks & Soil Section
4,750 3-5 Days
Natural Ground - زەوی سروشتی 6-8 Liquid Limit (LL)
Earthworks & Soil Section
14,000 3-5 Days
Natural Ground - زەوی سروشتی 9-1 Gradation
Earthworks & Soil Section
17,500 3-5 Days
Natural Ground - زەوی سروشتی 9-16 Dividing the sample
Earthworks & Soil Section
11,000 3-5 Days
Natural Ground - زەوی سروشتی 9-17 Correction
Earthworks & Soil Section
50,000 3-5 Days
Natural Ground - زەوی سروشتی 9-18 Drying
Earthworks & Soil Section
30,000 3-5 Days
Natural Ground - زەوی سروشتی 9-2 Washing on 200
Earthworks & Soil Section
4,000 3-5 Days
Natural Ground - زەوی سروشتی 9-4 Abrasion
Earthworks & Soil Section
24,000 3-5 Days
Natural Ground - زەوی سروشتی 9-6 MDD
Earthworks & Soil Section
19,250 3-5 Days
Natural Ground - زەوی سروشتی 9-7 MDD 4\"
Earthworks & Soil Section
14,750 3-5 Days
Natural Ground - زەوی سروشتی 9-8 CBR
Earthworks & Soil Section
25,000 3-5 Days
Sub grade 11-1-4 Compensation
Earthworks & Soil Section
4,000 3-5 Days
Sub grade 13-57 Gypsum
Earthworks & Soil Section
14,500 3-5 Days
Sub grade 14-1 SO3
Earthworks & Soil Section
23,000 3-5 Days
Sub grade 14-2 Organic Material
Earthworks & Soil Section
7,500 3-5 Days
Sub grade 14-4 TSS
Earthworks & Soil Section
11,000 3-5 Days
Sub grade 14-6 CaCO3
Earthworks & Soil Section
13,000 3-5 Days
Sub grade 6-10 Plastic Limit
Earthworks & Soil Section
7,750 3-5 Days
Sub grade 6-34 Distribution
Earthworks & Soil Section
8,250 3-5 Days
Sub grade 6-35 Test Definition
Earthworks & Soil Section
4,750 3-5 Days
Sub grade 6-8 Liquid Limit (LL)
Earthworks & Soil Section
14,000 3-5 Days
Sub grade 9-1 Gradation
Earthworks & Soil Section
17,500 3-5 Days
Sub grade 9-16 Dividing the sample
Earthworks & Soil Section
11,000 3-5 Days
Sub grade 9-17 Correction
Earthworks & Soil Section
50,000 3-5 Days
Sub grade 9-18 Drying
Earthworks & Soil Section
30,000 3-5 Days
Sub grade 9-2 Washing on 200
Earthworks & Soil Section
4,000 3-5 Days
Sub grade 9-6 MDD
Earthworks & Soil Section
19,250 3-5 Days
Sub grade 9-7 MDD 4\"
Earthworks & Soil Section
14,750 3-5 Days
Sub grade 9-8 CBR
Earthworks & Soil Section
25,000 3-5 Days
SUB-Base Course Crushed Gravel 10-6-3 Crushed Surfaces
Earthworks & Soil Section
6,000 3-5 Days
SUB-Base Course Crushed Gravel 11-1-4 Compensation
Earthworks & Soil Section
4,000 3-5 Days
SUB-Base Course Crushed Gravel 13-1 SO3
Earthworks & Soil Section
14,500 3-5 Days
SUB-Base Course Crushed Gravel 13-21 Soundness
Earthworks & Soil Section
46,000 3-5 Days
SUB-Base Course Crushed Gravel 13-57 Gypsum
Earthworks & Soil Section
14,500 3-5 Days
SUB-Base Course Crushed Gravel 14-4 T.S.S
Earthworks & Soil Section
11,000 3-5 Days
SUB-Base Course Crushed Gravel 14-6 CaCO3
Earthworks & Soil Section
13,000 3-5 Days
SUB-Base Course Crushed Gravel 2-1-2 Washing-OLD
Earthworks & Soil Section
4,000 3-5 Days
SUB-Base Course Crushed Gravel 5-11 Sampling
Earthworks & Soil Section
14,750 3-5 Days
SUB-Base Course Crushed Gravel 6-10 Plastic Limit
Earthworks & Soil Section
7,750 3-5 Days
SUB-Base Course Crushed Gravel 6-34 Distribution
Earthworks & Soil Section
8,250 3-5 Days
SUB-Base Course Crushed Gravel 6-35 Test definition
Earthworks & Soil Section
4,750 3-5 Days
SUB-Base Course Crushed Gravel 6-8 Liquid Limit
Earthworks & Soil Section
14,000 3-5 Days
SUB-Base Course Crushed Gravel 9-1 Gradation
Earthworks & Soil Section
17,500 3-5 Days
SUB-Base Course Crushed Gravel 9-10 Gravel Gradation
Earthworks & Soil Section
18,000 3-5 Days
SUB-Base Course Crushed Gravel 9-16 Dividing
Earthworks & Soil Section
11,000 3-5 Days
SUB-Base Course Crushed Gravel 9-17 Correction
Earthworks & Soil Section
50,000 3-5 Days
SUB-Base Course Crushed Gravel 9-18 Drying
Earthworks & Soil Section
30,000 3-5 Days
SUB-Base Course Crushed Gravel 9-2 Washing on 200
Earthworks & Soil Section
4,000 3-5 Days
SUB-Base Course Crushed Gravel 9-4 Abrasion
Earthworks & Soil Section
24,000 3-5 Days
SUB-Base Course Crushed Gravel 9-6 MDD
Earthworks & Soil Section
19,250 3-5 Days
SUB-Base Course Crushed Gravel 9-7 MDD 4\"
Earthworks & Soil Section
14,750 3-5 Days
SUB-Base Course Crushed Gravel 9-8 CBR
Earthworks & Soil Section
25,000 3-5 Days
SUB-Base Course Type A Covered 11-1-4 Compensation
Earthworks & Soil Section
4,000 3-5 Days
SUB-Base Course Type A Covered 13-57 Gypsum
Earthworks & Soil Section
14,500 3-5 Days
SUB-Base Course Type A Covered 14-1 SO3
Earthworks & Soil Section
23,000 3-5 Days
SUB-Base Course Type A Covered 14-2 Organic Material
Earthworks & Soil Section
7,500 3-5 Days
SUB-Base Course Type A Covered 14-4 TSS
Earthworks & Soil Section
11,000 3-5 Days
SUB-Base Course Type A Covered 14-6 CaCO3
Earthworks & Soil Section
13,000 3-5 Days
SUB-Base Course Type A Covered 5-11 Sampling
Earthworks & Soil Section
14,750 3-5 Days
SUB-Base Course Type A Covered 6-10 Plastic Limit
Earthworks & Soil Section
7,750 3-5 Days
SUB-Base Course Type A Covered 6-34 Distribution
Earthworks & Soil Section
8,250 3-5 Days
SUB-Base Course Type A Covered 6-35 Test Definition
Earthworks & Soil Section
4,750 3-5 Days
SUB-Base Course Type A Covered 6-8 Liquid Limit (LL)
Earthworks & Soil Section
14,000 3-5 Days
SUB-Base Course Type A Covered 9-1 Gradation
Earthworks & Soil Section
17,500 3-5 Days
SUB-Base Course Type A Covered 9-16 Dividing the sample
Earthworks & Soil Section
11,000 3-5 Days
SUB-Base Course Type A Covered 9-17 Correction
Earthworks & Soil Section
50,000 3-5 Days
SUB-Base Course Type A Covered 9-18 Drying
Earthworks & Soil Section
30,000 3-5 Days
SUB-Base Course Type A Covered 9-2 Washing on 200
Earthworks & Soil Section
4,000 3-5 Days
SUB-Base Course Type A Covered 9-4 Abrasion
Earthworks & Soil Section
24,000 3-5 Days
SUB-Base Course Type A Covered 9-5 Flakiness
Earthworks & Soil Section
9,250 3-5 Days
SUB-Base Course Type A Covered 9-6 MDD
Earthworks & Soil Section
19,250 3-5 Days
SUB-Base Course Type A Covered 9-7 MDD 4\"
Earthworks & Soil Section
14,750 3-5 Days
SUB-Base Course Type A Covered 9-8 CBR
Earthworks & Soil Section
25,000 3-5 Days
SUB-Base Course Type A Uncovered 11-1-4 Compensation
Earthworks & Soil Section
4,000 3-5 Days
SUB-Base Course Type A Uncovered 13-57 Gypsum
Earthworks & Soil Section
14,500 3-5 Days
SUB-Base Course Type A Uncovered 14-1 SO3
Earthworks & Soil Section
23,000 3-5 Days
SUB-Base Course Type A Uncovered 14-2 Organic Material
Earthworks & Soil Section
7,500 3-5 Days
SUB-Base Course Type A Uncovered 14-4 TSS
Earthworks & Soil Section
11,000 3-5 Days
SUB-Base Course Type A Uncovered 14-6 CaCO3
Earthworks & Soil Section
13,000 3-5 Days
SUB-Base Course Type A Uncovered 5-11 Sampling
Earthworks & Soil Section
14,750 3-5 Days
SUB-Base Course Type A Uncovered 6-10 Plastic Limit
Earthworks & Soil Section
7,750 3-5 Days
SUB-Base Course Type A Uncovered 6-34 Distribution
Earthworks & Soil Section
8,250 3-5 Days
SUB-Base Course Type A Uncovered 6-35 Test Definition
Earthworks & Soil Section
4,750 3-5 Days
SUB-Base Course Type A Uncovered 6-8 Liquid Limit (LL)
Earthworks & Soil Section
14,000 3-5 Days
SUB-Base Course Type A Uncovered 9-1 Gradation
Earthworks & Soil Section
17,500 3-5 Days
SUB-Base Course Type A Uncovered 9-16 Dividing the sample
Earthworks & Soil Section
11,000 3-5 Days
SUB-Base Course Type A Uncovered 9-17 Correction
Earthworks & Soil Section
50,000 3-5 Days
SUB-Base Course Type A Uncovered 9-18 Drying
Earthworks & Soil Section
30,000 3-5 Days
SUB-Base Course Type A Uncovered 9-2 Washing on 200
Earthworks & Soil Section
4,000 3-5 Days
SUB-Base Course Type A Uncovered 9-4 Abrasion
Earthworks & Soil Section
24,000 3-5 Days
SUB-Base Course Type A Uncovered 9-5 Flakiness
Earthworks & Soil Section
9,250 3-5 Days
SUB-Base Course Type A Uncovered 9-6 MDD
Earthworks & Soil Section
19,250 3-5 Days
SUB-Base Course Type A Uncovered 9-7 MDD 4\"
Earthworks & Soil Section
14,750 3-5 Days
SUB-Base Course Type A Uncovered 9-8 CBR
Earthworks & Soil Section
25,000 3-5 Days
SUB-Base Course Type B Covered 11-1-4 Compensation
Earthworks & Soil Section
4,000 3-5 Days
SUB-Base Course Type B Covered 13-57 Gypsum
Earthworks & Soil Section
14,500 3-5 Days
SUB-Base Course Type B Covered 14-1 SO3
Earthworks & Soil Section
23,000 3-5 Days
SUB-Base Course Type B Covered 14-2 Organic Material
Earthworks & Soil Section
7,500 3-5 Days
SUB-Base Course Type B Covered 14-4 TSS
Earthworks & Soil Section
11,000 3-5 Days
SUB-Base Course Type B Covered 14-6 CaCO3
Earthworks & Soil Section
13,000 3-5 Days
SUB-Base Course Type B Covered 5-11 Sampling
Earthworks & Soil Section
14,750 3-5 Days
SUB-Base Course Type B Covered 6-10 Plastic Limit
Earthworks & Soil Section
7,750 3-5 Days
SUB-Base Course Type B Covered 6-34 Distribution
Earthworks & Soil Section
8,250 3-5 Days
SUB-Base Course Type B Covered 6-35 Test Definition
Earthworks & Soil Section
4,750 3-5 Days
SUB-Base Course Type B Covered 6-8 Liquid Limit (LL)
Earthworks & Soil Section
14,000 3-5 Days
SUB-Base Course Type B Covered 9-1 Gradation
Earthworks & Soil Section
17,500 3-5 Days
SUB-Base Course Type B Covered 9-16 Dividing the sample
Earthworks & Soil Section
11,000 3-5 Days
SUB-Base Course Type B Covered 9-17 Correction
Earthworks & Soil Section
50,000 3-5 Days
SUB-Base Course Type B Covered 9-18 Drying
Earthworks & Soil Section
30,000 3-5 Days
SUB-Base Course Type B Covered 9-2 Washing on 200
Earthworks & Soil Section
4,000 3-5 Days
SUB-Base Course Type B Covered 9-4 Abrasion
Earthworks & Soil Section
24,000 3-5 Days
SUB-Base Course Type B Covered 9-5 Flakiness
Earthworks & Soil Section
9,250 3-5 Days
SUB-Base Course Type B Covered 9-6 MDD
Earthworks & Soil Section
19,250 3-5 Days
SUB-Base Course Type B Covered 9-7 MDD 4\"
Earthworks & Soil Section
14,750 3-5 Days
SUB-Base Course Type B Covered 9-8 CBR
Earthworks & Soil Section
25,000 3-5 Days
SUB-Base Course Type B Uncovered 11-1-4 Compensation
Earthworks & Soil Section
4,000 3-5 Days
SUB-Base Course Type B Uncovered 13-57 Gypsum
Earthworks & Soil Section
14,500 3-5 Days
SUB-Base Course Type B Uncovered 14-1 SO3
Earthworks & Soil Section
23,000 3-5 Days
SUB-Base Course Type B Uncovered 14-2 Organic Material
Earthworks & Soil Section
7,500 3-5 Days
SUB-Base Course Type B Uncovered 14-4 TSS
Earthworks & Soil Section
11,000 3-5 Days
SUB-Base Course Type B Uncovered 14-6 CaCO3
Earthworks & Soil Section
13,000 3-5 Days
SUB-Base Course Type B Uncovered 5-11 Sampling
Earthworks & Soil Section
14,750 3-5 Days
SUB-Base Course Type B Uncovered 6-10 Plastic Limit
Earthworks & Soil Section
7,750 3-5 Days
SUB-Base Course Type B Uncovered 6-34 Distribution
Earthworks & Soil Section
8,250 3-5 Days
SUB-Base Course Type B Uncovered 6-35 Test Definition
Earthworks & Soil Section
4,750 3-5 Days
SUB-Base Course Type B Uncovered 6-8 Liquid Limit (LL)
Earthworks & Soil Section
14,000 3-5 Days
SUB-Base Course Type B Uncovered 9-1 Gradation
Earthworks & Soil Section
17,500 3-5 Days
SUB-Base Course Type B Uncovered 9-16 Dividing the sample
Earthworks & Soil Section
11,000 3-5 Days
SUB-Base Course Type B Uncovered 9-17 Correction
Earthworks & Soil Section
50,000 3-5 Days
SUB-Base Course Type B Uncovered 9-18 Drying
Earthworks & Soil Section
30,000 3-5 Days
SUB-Base Course Type B Uncovered 9-2 Washing on 200
Earthworks & Soil Section
4,000 3-5 Days
SUB-Base Course Type B Uncovered 9-4 Abrasion
Earthworks & Soil Section
24,000 3-5 Days
SUB-Base Course Type B Uncovered 9-5 Flakiness
Earthworks & Soil Section
9,250 3-5 Days
SUB-Base Course Type B Uncovered 9-6 MDD
Earthworks & Soil Section
19,250 3-5 Days
SUB-Base Course Type B Uncovered 9-7 MDD 4\"
Earthworks & Soil Section
14,750 3-5 Days
SUB-Base Course Type B Uncovered 9-8 CBR
Earthworks & Soil Section
25,000 3-5 Days
SUB-Base Course Type C Covered 11-1-4 Compensation
Earthworks & Soil Section
4,000 3-5 Days
SUB-Base Course Type C Covered 13-57 Gypsum
Earthworks & Soil Section
14,500 3-5 Days
SUB-Base Course Type C Covered 14-1 SO3
Earthworks & Soil Section
23,000 3-5 Days
SUB-Base Course Type C Covered 14-2 Organic Material
Earthworks & Soil Section
7,500 3-5 Days
SUB-Base Course Type C Covered 14-4 TSS
Earthworks & Soil Section
11,000 3-5 Days
SUB-Base Course Type C Covered 14-6 CaCO3
Earthworks & Soil Section
13,000 3-5 Days
SUB-Base Course Type C Covered 5-11 Sampling
Earthworks & Soil Section
14,750 3-5 Days
SUB-Base Course Type C Covered 6-10 Plastic Limit
Earthworks & Soil Section
7,750 3-5 Days
SUB-Base Course Type C Covered 6-34 Distribution
Earthworks & Soil Section
8,250 3-5 Days
SUB-Base Course Type C Covered 6-35 Test Definition
Earthworks & Soil Section
4,750 3-5 Days
SUB-Base Course Type C Covered 6-8 Liquid Limit (LL)
Earthworks & Soil Section
14,000 3-5 Days
SUB-Base Course Type C Covered 9-1 Gradation
Earthworks & Soil Section
17,500 3-5 Days
SUB-Base Course Type C Covered 9-16 Dividing the sample
Earthworks & Soil Section
11,000 3-5 Days
SUB-Base Course Type C Covered 9-17 Correction
Earthworks & Soil Section
50,000 3-5 Days
SUB-Base Course Type C Covered 9-18 Drying
Earthworks & Soil Section
30,000 3-5 Days
SUB-Base Course Type C Covered 9-2 Washing on 200
Earthworks & Soil Section
4,000 3-5 Days
SUB-Base Course Type C Covered 9-4 Abrasion
Earthworks & Soil Section
24,000 3-5 Days
SUB-Base Course Type C Covered 9-5 Flakiness
Earthworks & Soil Section
9,250 3-5 Days
SUB-Base Course Type C Covered 9-6 MDD
Earthworks & Soil Section
19,250 3-5 Days
SUB-Base Course Type C Covered 9-7 MDD 4\"
Earthworks & Soil Section
14,750 3-5 Days
SUB-Base Course Type C Covered 9-8 CBR
Earthworks & Soil Section
25,000 3-5 Days
SUB-Base Course Type C Uncovered 11-1-4 Compensation
Earthworks & Soil Section
4,000 3-5 Days
SUB-Base Course Type C Uncovered 13-57 Gypsum
Earthworks & Soil Section
14,500 3-5 Days
SUB-Base Course Type C Uncovered 14-1 SO3
Earthworks & Soil Section
23,000 3-5 Days
SUB-Base Course Type C Uncovered 14-2 Organic Material
Earthworks & Soil Section
7,500 3-5 Days
SUB-Base Course Type C Uncovered 14-4 TSS
Earthworks & Soil Section
11,000 3-5 Days
SUB-Base Course Type C Uncovered 14-6 CaCO3
Earthworks & Soil Section
13,000 3-5 Days
SUB-Base Course Type C Uncovered 5-11 Sampling
Earthworks & Soil Section
14,750 3-5 Days
SUB-Base Course Type C Uncovered 6-10 Plastic Limit
Earthworks & Soil Section
7,750 3-5 Days
SUB-Base Course Type C Uncovered 6-34 Distribution
Earthworks & Soil Section
8,250 3-5 Days
SUB-Base Course Type C Uncovered 6-35 Test Definition
Earthworks & Soil Section
4,750 3-5 Days
SUB-Base Course Type C Uncovered 6-8 Liquid Limit (LL)
Earthworks & Soil Section
14,000 3-5 Days
SUB-Base Course Type C Uncovered 9-1 Gradation
Earthworks & Soil Section
17,500 3-5 Days
SUB-Base Course Type C Uncovered 9-16 Dividing the sample
Earthworks & Soil Section
11,000 3-5 Days
SUB-Base Course Type C Uncovered 9-17 Correction
Earthworks & Soil Section
50,000 3-5 Days
SUB-Base Course Type C Uncovered 9-18 Drying
Earthworks & Soil Section
30,000 3-5 Days
SUB-Base Course Type C Uncovered 9-2 Washing on 200
Earthworks & Soil Section
4,000 3-5 Days
SUB-Base Course Type C Uncovered 9-4 Abrasion
Earthworks & Soil Section
24,000 3-5 Days
SUB-Base Course Type C Uncovered 9-5 Flakiness
Earthworks & Soil Section
9,250 3-5 Days
SUB-Base Course Type C Uncovered 9-6 MDD
Earthworks & Soil Section
19,250 3-5 Days
SUB-Base Course Type C Uncovered 9-7 MDD 4\"
Earthworks & Soil Section
14,750 3-5 Days
SUB-Base Course Type C Uncovered 9-8 CBR
Earthworks & Soil Section
25,000 3-5 Days
تحریات التربة 5-14-9a (5-14-9a)Internal site exploration-lab vehicles
Earthworks & Soil Section
50,000 3-5 Days
تحریات التربة 5-14-9b Internal site exploration-customer vehicles 5-14-9b
Earthworks & Soil Section
30,000 3-5 Days
تحریات التربة 6-1 (Moisture Content (6-1
Earthworks & Soil Section
6,000 3-5 Days
تحریات التربة 6-10 (6-10)Plastic limit
Earthworks & Soil Section
7,750 3-5 Days
تحریات التربة 6-11 (6-11)Shrinkage limit
Earthworks & Soil Section
11,000 3-5 Days
تحریات التربة 6-12 (6-12)Shrinkage limit coefficient
Earthworks & Soil Section
2,500 3-5 Days
تحریات التربة 6-13 (6-13)Specific gravity
Earthworks & Soil Section
14,000 3-5 Days
تحریات التربة 6-14 (6-14)UC Undisturbed
Earthworks & Soil Section
10,500 3-5 Days
تحریات التربة 6-15 (6-15)UC Remolded
Earthworks & Soil Section
12,250 3-5 Days
تحریات التربة 6-17 (6-17)UC Hard soil
Earthworks & Soil Section
14,000 3-5 Days
تحریات التربة 6-18 (6-18)One dimensional consolidation
Earthworks & Soil Section
19,750 3-5 Days
تحریات التربة 6-18 (6-18)Elasticity coefficient
Earthworks & Soil Section
4,750 3-5 Days
تحریات التربة 6-2 (6-2) Wet Density
Earthworks & Soil Section
7,500 3-5 Days
تحریات التربة 6-20 (6-20)Swelling
Earthworks & Soil Section
9,500 3-5 Days
تحریات التربة 6-21 (6-21)Free Swelling
Earthworks & Soil Section
10,000 3-5 Days
تحریات التربة 6-22 (6-22)Constant head permeability
Earthworks & Soil Section
16,250 3-5 Days
تحریات التربة 6-23 (6-23)Falling head permeability
Earthworks & Soil Section
16,250 3-5 Days
تحریات التربة 6-24 (6-24)Direct shear-cohesionless soil
Earthworks & Soil Section
6,500 3-5 Days
تحریات التربة 6-25 (6-25)Direct shear-cohesion soil
Earthworks & Soil Section
10,000 3-5 Days
تحریات التربة 6-26 (6-26)Direct shear
Earthworks & Soil Section
8,750 3-5 Days
تحریات التربة 6-27 (6-27)Triaxial-cohesionless soil
Earthworks & Soil Section
12,250 3-5 Days
تحریات التربة 6-28 (6-28)Triaxial-cohesion soil
Earthworks & Soil Section
17,000 3-5 Days
تحریات التربة 6-29 (6-29)Triaxial
Earthworks & Soil Section
14,750 3-5 Days
تحریات التربة 6-3 (6-3) Dry Density
Earthworks & Soil Section
6,500 3-5 Days
تحریات التربة 6-30 (6-30)Drained Triaxial
Earthworks & Soil Section
14,500 3-5 Days
تحریات التربة 6-31 (6-31)Fan Test
Earthworks & Soil Section
6,500 3-5 Days
تحریات التربة 6-32 (6-32)Hydrometer
Earthworks & Soil Section
25,250 3-5 Days
تحریات التربة 6-33 (6-33)Swelling-swelling device
Earthworks & Soil Section
17,000 3-5 Days
تحریات التربة 6-34 (6-34)Dividing
Earthworks & Soil Section
8,250 3-5 Days
تحریات التربة 6-35 (6-35)Test Definition
Earthworks & Soil Section
4,750 3-5 Days
تحریات التربة 6-4 (6-4)Sieve analysis
Earthworks & Soil Section
12,250 3-5 Days
تحریات التربة 6-5 (6-5)Hydrometer analysis
Earthworks & Soil Section
21,000 3-5 Days
تحریات التربة 6-6 (6-6)Sieve no.200
Earthworks & Soil Section
7,000 3-5 Days
تحریات التربة 6-7 (6-7)Liquid limit-1 point
Earthworks & Soil Section
11,250 3-5 Days
تحریات التربة 6-8 (6-8)Liquid limit-3 points
Earthworks & Soil Section
14,000 3-5 Days
تحریات التربة 6-9 (6-9)Liquid limit-con pentration
Earthworks & Soil Section
7,500 3-5 Days
تحریات التربة 8-17-1 (8-17-1)Equipment transportation-internal
Earthworks & Soil Section
50,000 3-5 Days
تحریات التربة 8-17-3 (8-17-3)Internal site equipment-lab vehicles
Earthworks & Soil Section
30,000 3-5 Days